Builder’s Log

Date Description
8/11/2022 Tail kit for Sonex Model B has been ordered.
10/20/2022 The Airframe kit has been ordered. This will be a Tri Gear kit with a Rotax Engine.
11/11/2022 The tail kit arrives. Inventory completed.
11/15/2022 Rudder is completed
11/16/2022 Vertical Stabilizer forward spar is complete
11/18/2022 Work on Vertical Stabilizer
11/23/2022 Vertical Stabilizer completed
11/25/2022 Work on Elevators
11/27/2022 Horizonal Stabilizer work underway.
12/5/2022 Horizonal stabilizer skinned.
12/7/2022 Work benches updated with new tops. Tools cleaned and better organized.
12/14/2022 Vertical stabilizer completed. tip installed. Will need to be cut for tail light.
12/16/2022 Elevator completed. Horizonal stabilizer completed except for one wing tip. Need to order new parts. Cut too much fiberglass.
1/13/2023 Horizonal Stabilizer Tips installed. Empennage is complete.
3/30/2023 Airframe arrived! 6 boxes loaded into hanger. Starting Inventory